Keating Cross Road at Central Saanich Road will be fully closed overnight on Monday, July 6, and Tuesday, July 7, 2026, to allow for intersection base repairs and paving.
A third night will be required, tentatively scheduled for July 8 or 9.
Full closures will be in place from 8 p.m. to 5 a.m. on the first two nights, with single-lane alternating traffic planned for the third night, if required.
Emergency services will have access at all times. All other vehicles will be restricted during full closures. Motorists and travellers are advised to seek an alternative route or to plan ahead and follow trucking routes if travelling during these hours.
Full closures are required to allow crews to complete this work safely and efficiently. The area is a construction zone and drivers are reminded to obey posted speed limits, follow signage and use caution when travelling through it.
For the latest road conditions and traffic updates, visit: https://www.drivebc.ca/
Learn More:
- To learn more about the repair work, visit: www.gov.bc.ca/keatingoverpass