Drivers are advised that the Agassiz-Rosedale Bridge on Highway 9 will require two full closures of 20 minutes each during the night of Wednesday, April 10, 2019, for seismic and safety upgrade work.
The closures are expected to take place between 10 p.m. and 5 a.m.
Watch for signage and obey all traffic control personnel.
The ministry appreciates people’s patience while this work is done to strengthen the bridge and bring it up to modern seismic standards.
For travel information available 24/7, visit: www.DriveBC.ca