The Quick Bridge south of Telkwa opened to pedestrian traffic on Monday, June 28, 2021.
The bridge has been closed to all traffic since a routine inspection on June 18.
Engineers from the Ministry of Transportation and Infrastructure have been on site performing a detailed inspection to determine next steps.
There is currently no estimate for when the structure will reopen to vehicle traffic. The ministry is working to resolve this issue as quickly and safely as possible.
A short detour is available to residents of Quick who can access Telkwa and Highway 16 via Lawson Road.
Drivers are reminded to follow posted speed limits, traffic-control devices and flag persons. For the most up-to-date information before travel, visit: www.DriveBC.ca