Highway 1 at Tunnel Hill on the Malahat has reopened to two-way traffic.
Drivers should be prepared for construction conditions, including no median barrier, narrow lanes, limited shoulder widths and reduced speed zones.
Additional repairs to fully restore the site will continue for the coming months. Drivers can expect active construction equipment with some single-lane alternating traffic and intermittent closures as construction warrants.
Please obey construction zone speed limits and the direction of traffic control personnel. Check DriveBC.ca for additional updates.