Artist's rendering of Keating Cross Road overpass. (flickr.com)

Media Contacts

Ministry of Transportation and Infrastructure

Media Relations
250 356-8241

Backgrounders

What travellers can expect during construction
  • The southbound on-ramp from Keating Cross Road to Highway 17 is closed, and will remain closed throughout the construction period.
  • Passenger traffic will access the highway via a detour from Central Saanich Road to Tanner Road.
  • Commercial traffic and tour buses will be detoured to Central Saanich Road along the existing truck route.
  • Access to Martindale Road from Highway 17 is permanently closed, with access available from Gliddon Road.
  • Nightly lane closures will happen in each direction along Highway 17 between Tanner Road and Island View Road, resulting in:
    • single-lane traffic from 7 p.m. until 6 a.m. (northbound); and
    • single-lane traffic from 9 p.m. until 6 a.m. (southbound).
  • The Ministry of Transportation and Infrastructure and the District of Central Saanich are working with the RCMP, local police and Commercial Vehicle Safety and Enforcement on speed control and enhanced enforcement through the detour area.
  • The ministry will monitor key intersections and has the ability to adjust light timing and other control measures, if needed, to help ease congestion and increase safety.
  • Night work is expected to be in place for extended periods during the first year of construction. 
  • In order to facilitate work on Highway 17, lane closures are required.
    • Due to the existing traffic volumes on Highway 17, this work will take place at night in order to avoid major traffic disruptions.
  • As construction is underway, drivers are reminded to obey all signs and traffic control personnel in the area.
  • Travellers should visit DriveBC for the most up-to-date traffic pattern changes, traffic impacts and information on detour routes.